The bottom section, which is 4′ tall will be in the concrete, leaveing me 32′ above ground. There will be roughly 2′ of mast putting the base plate of the Hex Beam at 34′.
![bmYNC6EcSW6n0Z0kIeEJTQ_thumb_25b9](http://www.kk3mm.com/wp-content/uploads/2016/08/bmYNC6EcSW6n0Z0kIeEJTQ_thumb_25b9-300x118.jpg)
![The proposed location.](http://www.kk3mm.com/wp-content/uploads/2016/10/1-300x300.jpg)
![Digging the base. About 6ft from power and telephone and 11 ft from my septic tank.](http://www.kk3mm.com/wp-content/uploads/2016/10/3-225x300.jpg)
![The base section formed up and waiting for the day to pour concrete.](http://www.kk3mm.com/wp-content/uploads/2016/10/2-300x225.jpg)
![Concrete poured and forms removed. My chief engineer (XLY) K0LMR is ok with it.](http://www.kk3mm.com/wp-content/uploads/2016/10/4-300x225.jpg)
![Working on stacking. Kirk (N0JDP) and our friend Robert.](http://www.kk3mm.com/wp-content/uploads/2016/10/5-225x300.jpg)
![Close up of the gin pole pully.](http://www.kk3mm.com/wp-content/uploads/2016/10/6-300x225.jpg)
![All sections stacked.](http://www.kk3mm.com/wp-content/uploads/2016/10/7-225x300.jpg)
![From the hill behind the house. Hex beam installed.](http://www.kk3mm.com/wp-content/uploads/2016/10/8-300x225.jpg)
![Looking up from the base.](http://www.kk3mm.com/wp-content/uploads/2016/10/9-225x300.jpg)
The bottom section, which is 4′ tall will be in the concrete, leaveing me 32′ above ground. There will be roughly 2′ of mast putting the base plate of the Hex Beam at 34′.